Hackney Wick and White Post Lane

Groundworks

Client: May Gurney - British Waterways

Contract Value: £600k

Contract Duration: 15 Weeks

These works were carried out as part of the Olympics regeneration scheme along the River Lee. The towpath and ramp were broken out and re-instated with new foundations, pre-cast retaining walls, gabion walls, service ducts, railings and kerbs. Materials for this job were transported and delivered by barge and floating pontoon with a crane to offload them to the river side.